Showing posts with label tanks. Show all posts
Showing posts with label tanks. Show all posts

Tuesday, December 27, 2016

December 26 2016 Sailboat Update



December 26 2016 Sailboat Update
One year ago, I had the double layer base put together, and the bulkheads assembled



By request I am adding a picture of the floor insulation and framing. The edge has a 2x4 on edge, then half a 2x4 (ripped lengthwise) as a nailer. there are 2x4's (all 2x material is cedar) under each bulkhead, and under each seam in the plywood. Note that Dave Z does not insulate his floor this way, but I hate cold feet, so made the sandwich bottom.




Today, 26 December 2016, I am working on the hatch coamings and assembling the first layer of the main cabin roof.

A jig to control where the router could cut

Here is one of the carlines (I had to look up the correct name) notched into a slot cut into the bulkhead beam. There is a notch cut into the top inside edge, where a sliding screen will go to keep out bugs when the hatch is open. The larger slot below it is to hold a ladder,  which will double as security bars when in the stowed position.

Hatch coaming being glued up on cross beam (carline).

Here are handrails for the interior under construction, as per Dave Z's instruction. These ones are made from cedar sold as deck planks, actual measurements 1" thick by 5 3/8" high


 Handrails installed and being glued up. The top 1x4 will hide the seam in the plywood roof.


I have also been cutting and fitting the plywood that will become the galley floor. Here you can see the two 50 gallon fresh water tanks, and the piece of Form-ply plywood, which is removable to access storage between the tanks.
Here the floor pieces are in place, with the shower pan just in the foreground. The bar fridge will be flipped on it's back and super insulated, directly above where it is sitting now. Before gluing any of these parts, I need to paint under the tanks and shower pan, then cut in the clean out hatches into the tanks, and the matching holes in the plywood to reach those hatches.

Thursday, August 18, 2016

Organic Carbon Fibre Masts, August 2016

Here is an update for August, 2016. I picked up my 
trees, and have done the rough work of converting them to "Organic Carbon Fibre" Masts. Of course, this is only going by what my high school biology teacher told me trees were made of, with a few years in between to make the memories a little fuzzy. Anyways, it is much easier to let Mother Nature do the layup of the carbon fibre than doing it myself.
Also had to build some heavy duty saw horses for this step.  
 I have the best pole completely power planed as the main mast, and the second best pole about 70% done, before the belt in my planer melted. I have just exchanged it on warranty, as the planer and replacement belt are discontinued, but one local store had some of the old stock still.
Next is to take the belt sander to  the poles, cut to length, and put on a coat of paint.
There is a third pole in case I find major flaws in the first two.
 I also bought two 50 gallon water tanks, here is a picture of the starboard tank in position, and at the bottom of the picture is a corner of a 4" deep 37x37" tray that will form my shower pan. The pan will get a sump pump and an elevated grating to stand on while showering.

Not shown is a 32 gallon tank that will be installed for grey water, when in a location that does not allow discharge.







I purchased the various fittings to fill and vent, as well as a 8" clean out with rubber seal for each tank. Once I have the tanks and bulkheads all figured out, I will cut and install the fittings